3 Series E46 325i (M54) TOUR
Installation:
Check dowel sleeve for damage and correct installation
position.
Installation:
Position of dowel sleeve (1) in dual-mass flywheel is
identified by two notches next to associated bolt hole.
Installation:
Clean thread and install new micro-encapsulated screws.
Tightening torque 11 22 1AZ.
RA Removing and installing or replacing flywheel (M52 / S52 / M52TU / M54 / S54)
BMW AG - TIS
13.02.2013 23:10
Issue status (12/2007) Valid only until next DVD is issued
Copyright
Page - 2 -