bmw Workshop Repair Guides

BMW Workshop Service and Repair Manuals

10 RA Installing Replacement Transmission (GS6-53BZ_DZ) > < 9 RA Installing Replacement Transmission (GS5-39DZ)
Page 2
background image

Convert following components of old transmission to new
transmission:

Release bearing and release lever.

Threaded pin for slave cylinder.

Reversing light switch.

Tightening torque 23 41 5AZ

.

Convert shift rod joint.

Push retaining ring (1) back and drive out straight pin (2).

Installation:

Check damping disk (6) in joint for damage.

Replace damping disk (6) in joint if necessary.

Detach breather (1) and protective sleeve (2) from selector shaft.

Lever out sealing flap (3) and breather (1).

RA  Installing replacement transmission (GS5-39DZ)

BMW AG - TIS

15.02.2013  23:27

Issue status (12/2007) Valid only until next DVD is issued

Copyright

Page  - 2 -

10 RA Installing Replacement Transmission (GS6-53BZ_DZ) > < 9 RA Installing Replacement Transmission (GS5-39DZ)