bmw Workshop Repair Guides

BMW Workshop Service and Repair Manuals

1 RA Removing And Installing_replacing Actuator (S6S 420G SMG)|Page 1086 > < 1 C- And F-transmissions)|Page 1083
Page 1
background image

23 41 005

Removing and installing/replacing actuator
(S6S 420G SMG)

Special tools required:

00 2 030

23 0 040

23 0 240

Note:

After completing work:

Proceed according to test program, refer to "Service

Functions" in DIS Tester.

Read out fault memory and clear fault entries.

Check fluid level in hydraulic system.

Necessary preliminary tasks:

Depressurize hydraulic system.

Disconnect battery, battery positive lead from battery terminal

Remove intake air manifold

Remove fan with fan impeller

Remove underbody protection.

Remove catalytic converter and intermediate pipes

Remove middle heat shield (1).

RA  Removing and installing/replacing actuator (S6S 420G SMG)

BMW AG - TIS

16.02.2013  15:30

Issue status (12/2007) Valid only until next DVD is issued

Copyright

Page  - 1 -

1 RA Removing And Installing_replacing Actuator (S6S 420G SMG)|Page 1086 > < 1 C- And F-transmissions)|Page 1083