bmw Workshop Repair Guides

BMW Workshop Service and Repair Manuals

9 RA Removing And Installing Transmission (GS6-53BZ)|Page 685 > < 9 RA Removing And Installing Transmission (GS6-53BZ)|Page 683
Page 6
background image

To avoid damaging the sound insulation (1) on the bulkhead, raise
the transmission after withdrawing the transmission pin from the
pilot bearing against the direction of engine lowering to 0

°

.

For safety, a protective film (2) can also be placed between the
transmission and the sound insulation.

Installation:

Pay attention to correction position of dowel sleeves.

Replace damaged dowel sleeves.

Ensure correct position of cover plate.

Installation:

Remove release unit and release lever and clean.

Installation:

Check lubrication of transmission input shaft for sticky
consistency. If grease is sticky, replace clutch plate.

Check clutch plate for friction rust in taper splines and replace
if necessary.

Mechanically remove old grease and lining abrasion from the
taper splines of the clutch disk (with a cloth).

RA  Removing and installing transmission (GS6-53BZ)

BMW AG - TIS

22.02.2013  12:15

Issue status (12/2007) Valid only until next DVD is issued

Copyright

Page  - 6 -

9 RA Removing And Installing Transmission (GS6-53BZ)|Page 685 > < 9 RA Removing And Installing Transmission (GS6-53BZ)|Page 683