3 Series E91 320i (N43) TOUR
![background image](/bmw/3_Series_E91/320i_N43_TOUR/page-233004.png)
Strip insulation - length (A) - from cable end.
Distance (A) = 15 mm.
Push heavy-current connector (1) over stripped cable end and
screw into position.
Push shrink-fit hose (3) over repair cable.
Screw threaded sleeve (1) of repair cable (2) to heavy-current
connector.
Push shrink-fit hose (1) over connecting point and shrink on with
a hot-air blower (2).
RA Replacing safety battery terminal (SBK)
BMW AG - TIS
24.01.2013 08:13
Issue status (12/2007) Valid only until next DVD is issued
Copyright
Page - 4 -