bmw Workshop Repair Guides

BMW Workshop Service and Repair Manuals

10 RA Removing And Installing Transmission (GS6-53BZ) N54|Page 868 > < 10 RA Removing And Installing Transmission (GS6-53BZ) N54|Page 866
Page 4
background image

Note:

Pressure line of clutch slave cylinder remains connected.

Important!

Relieve tension on clutch slave cylinder slowly; otherwise air
will be drawn in through sealing sleeve.

Release nuts and remove clutch slave cylinder.

Tightening torque 21 52 5AZ

.

Lever out retainer (1).

Disengage shift rod (2).

Installation:

Grease shift rod.

Grease, refer to BMW Service Operating Fluids.

Make sure shims (3) are in correct position.

Unlock bearing pin (1) in direction of arrow and remove.

 Lift out shift arm.

Installation:

Grease bearing pins (1).

Grease, refer to BMW Service Operating Fluids.

Release screws.

Steel screws, tightening torque 23 00 1AZ

.

Aluminium screws/bolts (3, 4, 5, 9, 10), tightening torque 
23 00 2AZ

.

Important!

Do not suspend the transmission from the transmission input
shaft during removal and installation as this will deform the
clutch plate. Pull out transmission towards rear and remove.

RA  Removing and installing transmission (GS6-53BZ) N54

BMW AG - TIS

23.02.2013  05:38

Issue status (12/2007) Valid only until next DVD is issued

Copyright

Page  - 4 -

10 RA Removing And Installing Transmission (GS6-53BZ) N54|Page 868 > < 10 RA Removing And Installing Transmission (GS6-53BZ) N54|Page 866