bmw Workshop Repair Guides

BMW Workshop Service and Repair Manuals

3 RA Removing And Installing Or Replacing One Delivery Line (N43)|Page 673 > < 3 RA Removing And Installing Or Replacing One Delivery Line (N43)|Page 671
Page 4
background image

Connect pressure line (1), tightening nuts hand-tight only in the
process.

Important!

Connect pressure line (1) without tension only.

In order to ensure that the pressure line is connected without
tension, it must be possible to screw on the nuts easily by
hand!

If the nuts cannot be easily screwed on by hand, the injector 
must be turned into the installation position.

Note:

Description of "Turning injector into installation position" in the
following two work steps. 

Only if injector has to be turned into installation position:

Release screw a few turns until holding-down element (1) is

slackened.

Turn injector (2) in direction of arrow until nuts on pressure

line can be easily screwed on by hand. 

To do so, engage wrench on hexagon head of injector if

necessary.

Tighten nuts on pressure line hand-tight.

Important!

Do not under any circumstances pull injector out of bore! 

If the injector is pulled out of the bore hole, the PTFE sealing
ring must be replaced! Replacing PTFE sealing ring, refer to 
13 53 310 .

Tighten down screw for holding-down element (1). 

Tightening torque 13 53 1AZ

.

RA  Removing and installing or replacing one delivery line (N43)

BMW AG - TIS

20.01.2013  10:36

Issue status (12/2007) Valid only until next DVD is issued

Copyright

Page  - 4 -

3 RA Removing And Installing Or Replacing One Delivery Line (N43)|Page 673 > < 3 RA Removing And Installing Or Replacing One Delivery Line (N43)|Page 671