3 Series E92 320d (N47) COUPE
Expose suction line up to connection on vane pump.
Release hose clamp (2) and detach suction line (1) from vane
pump.
Installation:
Markings (3) on suction line and vane pump connection must
match up.
After installation:
•
Fill and bleed hydraulic system
•
Check pipe connections for leaks
RA Replacing suction line for power steering (N47)
BMW AG - TIS
21.01.2013 03:55
Issue status (12/2007) Valid only until next DVD is issued
Copyright
Page - 2 -