3 Series E92 330i (N53) COUPE
Important!
Follow sequence of screw connections:
1.
Tighten down nut (1) with special tool 13 5 020 .
Tightening torque 13 53 7AZ
.
2.
Tighten nut (2). Tightening torque 13 53 7AZ
.
3.
Tighten down screw (3) for holder. Tightening torque
13 53 2AZ
.
Assemble engine.
Check fuel system for leaks.
Check function of DME.
RA Removing and installing/replacing pressure line (N54, N53)
BMW AG - TIS
09.02.2013 21:29
Issue status (12/2007) Valid only until next DVD is issued
Copyright
Page - 4 -