bmw Workshop Repair Guides

BMW Workshop Service and Repair Manuals

7 RA Complete Removal And Installation Of Input And Output Shafts (S5D 200G_ 250G)|Page 596 > < 7 RA Complete Removal And Installation Of Input And Output Shafts (S5D 200G_ 250G)|Page 594
Page 10
background image

Install reverse gear with collar (2) facing upwards and reverse
gear shaft with long extension (1) in special tool 23 2 400.

Coat locating face of short extension (3) on reverse gear with
Loctite 574 seals compound.

Liquid seals,

see BMW Parts Service.

Check end float of the input shaft.

Apply special tool 23 2 420 on the input shaft.

Insert shim (2) and new circlip (1) in the groove.

Check end float with a feeler gauge.

End float 0.04 mm.

Note:

Shims (2) can be obtained from Parts Service in thicknesses
(X) of 2.3 ... 2.65 mm.

Heat input shaft inner bearing race (1) in the front case section to
approx. 110 ... 120 

°

C (hot air blower).

The heating temperature must be precisely maintained. Check
with a thermometer.

Thermometer, refer to BMW Service Workshop Equipment
Planning Documentation.

Align selector rods with one another.

After heating, insert the roller bearing (2) with thick grease into the
bearing sleeve with large diameter facing upwards.

Carefully attach the front case section.

Note:

The 5th gear synchronizer ring can jam.

After completely assembling the transmission, the 5th gear
synchronizer ring can be loosened again by twisting the
output/input shafts against each other.

RA  Complete removal and installation of input and output shafts (S5D 200G/ 250G)

BMW AG - TIS

23.01.2013  07:12

Issue status (12/2007) Valid only until next DVD is issued

Copyright

Page  - 10 -

7 RA Complete Removal And Installation Of Input And Output Shafts (S5D 200G_ 250G)|Page 596 > < 7 RA Complete Removal And Installation Of Input And Output Shafts (S5D 200G_ 250G)|Page 594