5 Series E39 520i (M52TU) SAL
37 13 ...
Assembly instructions for a new tube (air line)
and new screw connection
Caution!
The tubes must not be cut!
Do not dismantle the screw connection!
Tighten complete new screw connection (comprising toothed ring
(1), cap screw (2) and assembly plug (3), in air spring strut and/or
distributor block and/or tube (of spring to air tank).
Tightening Torque,
refer to Technical Data 37 12 3AZ.
Remove assembly plug (3).
Slide new tube (4) in as far as bulge (4.1).
(2) Cap screw
(5) Air spring strut and/or distributor block and/or tube (from
spring to air tank)
RA Assembly instructions for a new tube (air line) and new screw connection
BMW AG - TIS
05.02.2013 07:22
Issue status (12/2007) Valid only until next DVD is issued
Copyright
Page - 1 -