5 Series E39 523i (M52TU) SAL
23 23 508
Detaching and mounting all synchronizing
devices S5D 200G/250G
Transmission removed.
Completely remove and install input and output shafts,
refer to 23 21 505.
Remove gears and shafts with selector rods from special tool
23 2 400.
Remove selector rods (1).
Separate layshaft from gears and shafts.
Remove input shaft, needle bearing (1) and 5th gear synchronizer
ring.
RA Detaching and mounting all synchronizing devices S5D 200G/250G
BMW AG - TIS
14.02.2013 13:56
Issue status (12/2007) Valid only until next DVD is issued
Copyright
Page - 1 -