5 Series E39 525d (M57) SAL
Slacken nut (1).
Disconnect ground cable (2) and lay to one side.
Attach special tool 11 0 020 to crane.
Unhook chain (1) at 1st chain link.
Suspend hook in front suspension lug (2) on cylinder head.
Unhook chain (1) at last chain link.
Suspend hook in rear suspension lug (2) on crankcase.
Caution!
Do not damage cooling loop for power steering and A/C
condenser.
Carefully lift out engine.
RA Removing and installing engine (M57)
BMW AG - TIS
17.02.2013 16:08
Issue status (12/2007) Valid only until next DVD is issued
Copyright
Page - 9 -