5 Series E39 525tds (M51) TOUR
Lift pressure spring and sleeve out of transmission housing with
magnet (1) or grippers.
Installation:
Following new components must be fitted in succession:
1.
Collared bushing
2.
Stop pin
3.
Spring
4.
Cap
Caution!
It must be possible to drive in the collared bushing without the
exertion of great effort.
Anodized layer of collared bushing must not be damaged.
Screw in collared bushing (1) partially with slot (S)
counterclockwise (90
°
to direction of travel).
Drive collared bushing with special tool 23 3 110 and plastic
hammer into transmission housing as far as it will go.
Insert stop pin (2) and pressure spring (3) in collared bushing.
RA Replacing catch pin (S5D ...Z and GS5-39DZ / C- and F-transmissions)
BMW AG - TIS
20.02.2013 04:20
Issue status (12/2007) Valid only until next DVD is issued
Copyright
Page - 2 -