5 Series E39 525tds (M51) TOUR
Grip clamping sleeve (1) and slacken nut (2).
Installation:
Adjust selector lever
Grip cable (1) at hexagon head (2).
Unscrew nut (3).
Pull cable (1) out of holder.
Installation:
Tightening torque 25 16 1AZ .
Note:
6HP26Z transmission only!
Lever out retainer (3) downwards using a screwdriver.
Release screw (1) on interlock cable.
Tightening torque 25 16 5AZ .
Pull plug connector (2) out of bracket and disconnect.
RA Removing and installing/replacing shift tower (Steptronic)
BMW AG - TIS
20.02.2013 04:58
Issue status (12/2007) Valid only until next DVD is issued
Copyright
Page - 2 -