5 Series E39 525tds (M51) TOUR
Support transmission with a workshop hoist.
Unclip cable from cross-member.
Release screws and remove cross-member (1).
Tightening torque, 23 71 1AZ / 2AZ.
Lower transmission slightly.
Lever out spring (1) with a screwdriver from lug (2) on housing.
Tilt spring upwards.
Remove bearing pin (1).
Installation:
Grease bearing pin (1).
Grease,
refer to BMW Service Operating Fluids.
Remove selector arm.
Detach support bearing (1) from selector arm.
Installation:
Grease bearing pin of selector arm.
Grease,
refer to BMW Service Operating Fluids.
Fit support bearing (1) with opening (3) towards rear on selector
arm.
RA Replacing shift arm for shift-lever mount
BMW AG - TIS
20.02.2013 05:05
Issue status (12/2007) Valid only until next DVD is issued
Copyright
Page - 2 -