bmw Workshop Repair Guides

BMW Workshop Service and Repair Manuals

4 RA Replacing Battery Positive Lead (between Battery Positive Connection Point And S > < 3 RA Replacing Battery Positive Lead (between Battery Positive Connection Point, Star|Page 816
Page 3
background image

Slacken nut (1) on battery positive connection point.

Tightening torque,

refer to 12 51 3AZ.

Detach battery positive terminal upwards.

All cars:

Unscrew nut (1).

Installation:

Tightening torque,

refer to Technical Data 12 41 4AZ.

Remove battery positive lead (2).

Remove battery positive lead (3) from solenoid switch on starter.

Remove cap (1).

Release nut on battery positive lead (2) on alternator.

Unclip battery positive lead (2) from holder (3).

Remove battery positive lead (2) upwards.

RA  Replacing battery positive lead (between battery positive connection point, star

BMW AG - TIS

20.02.2013  12:20

Issue status (12/2007) Valid only until next DVD is issued

Copyright

Page  - 3 -

4 RA Replacing Battery Positive Lead (between Battery Positive Connection Point And S > < 3 RA Replacing Battery Positive Lead (between Battery Positive Connection Point, Star|Page 816