bmw Workshop Repair Guides

BMW Workshop Service and Repair Manuals

51 Engine Wiring Loom > < 3 RA Replacing Battery Positive Lead (between Battery Positive Connection Point And S|Page 836
Page 3
background image

Unscrew nut (1).

Installation:

Tightening torque,

refer to Technical Data 12 41 4AZ.

Remove battery positive lead (2).

Battery positive lead (3) remains in the car.

RA  Replacing battery positive lead (between battery positive connection point and s

BMW AG - TIS

20.02.2013  13:03

Issue status (12/2007) Valid only until next DVD is issued

Copyright

Page  - 3 -

51 Engine Wiring Loom > < 3 RA Replacing Battery Positive Lead (between Battery Positive Connection Point And S|Page 836