5 Series E39 535i (M62) SAL
Release screws.
Tightening torque 26 11 1AZ.
Installation:
Replace self-locking nuts.
When tightening screws down, grip each screw while
tightening down its nut. This prevents the flexible disk from
being subjected to torsion stress.
Grip propeller shaft at center bearing and release nuts.
Tightening torque 26 11 6AZ.
Installation:
Center bearing must be aligned at right angles to propeller
shaft.
Caution!
Do not let propeller shaft fall into joints.
Joints and rubber sleeve can be damaged on constant-
velocity joint.
Bend propeller shaft downwards at center bearing, remove from
transmission output flange and tie back to one side.
RA Removing and installing transmission (S5D 310Z, M62)
BMW AG - TIS
20.02.2013 14:01
Issue status (12/2007) Valid only until next DVD is issued
Copyright
Page - 4 -