5 Series E39 540i (M62) SAL
Caution!
Do not distort conrods or crankshaft.
Use the old connecting-rod bolts to check connecting-rod
clearance.
Tighten down conrod screws with special tool 00 9 120 or
special tool 11 2 110, respectively.
Tightening Torque,
refer to Technical Data 11 24 1AZ.
Remove bearing cover and read off bearing clearance across
width of pinched plastic thread with the help of the measuring
scale.
Conrod bearing clearance,
refer to Technical Data.
-
Remove plastic thread.
-
Lubricate crankshaft and bearing shells.
-
Insert new conrod bolts and tighten down.
Tightening Torque,
refer to Technical Data 11 24 1AZ.
RA Replacing all conrod bearings (M62)
BMW AG - TIS
20.02.2013 12:17
Issue status (12/2007) Valid only until next DVD is issued
Copyright
Page - 2 -