5 Series E39 540i (M62) SAL
Connection on vane pump
(1)
to steering unit
(2)
to container
Unfasten nut (3).
Installation:
Secure support (1) to pump.
Tightening Torque,
refer to Technical Data 32 41 2AZ.
Secure nut (2) handtight against engine support.
Tighten nut (3).
Tightening Torque,
refer to Technical Data 32 41 2AZ.
Unfasten mount on oil pan and remove pump.
Installation:
Tightening Torque,
refer to Technical Data 32 41 2AZ.
RA Removing and installing vane pump for power steering (535i - 540i)
BMW AG - TIS
20.02.2013 16:32
Issue status (12/2007) Valid only until next DVD is issued
Copyright
Page - 2 -