5 Series E39 540i (M62) TOUR
11 31 051
Replacing timing chain (M62 up to 9/98)
Removal
Removal of timing chain is described separately from installation.
Assembly sequence for removal and installation is different.
Remove spark plugs,
refer to 12 12 011.
Remove both cylinder head covers,
refer to 11 12 004.
Remove oil lines on left and right of cylinder head.
Remove vibration damper,
refer to 11 23 010.
Release central bolt of hub for vibration damper,
refer to 11 23 031.
Rotate engine at slackened central bolt in direction of rotation until
the first cylinder is in TDC firing position.
RA Replacing timing chain (M62 up to 9/98)
BMW AG - TIS
20.02.2013 13:32
Issue status (12/2007) Valid only until next DVD is issued
Copyright
Page - 1 -