5 Series E60 530i (N53) SAL
N53:
Release banjo bolt (1) and detach pressure line (2) from vane
pump.
Installation:
Replace all sealing rings.
Make sure pressure line is laid without tension and with sufficient
spacing to adjoining components.
Tightening torque 32 41 3AZ
.
Expose pressure line up to connection on power steering gear.
Release banjo bolt and disconnect pressure line.
Installation:
Replace all sealing rings.
Make sure pressure line is laid without tension and with sufficient
spacing to adjoining components.
Tightening torque 32 41 3AZ
.
After installation:
•
Fill and bleed hydraulic system
•
Check pipe connections for leaks
RA Replacing pressure line for power steering (N52, N53)
BMW AG - TIS
21.02.2013 18:26
Issue status (12/2007) Valid only until next DVD is issued
Copyright
Page - 2 -