5 Series E61 525d (M57T2) TOUR
Note:
Version 1:
Unfasten nut.
Remove cable (1).
Installation:
Adjusting cable:
•
Release nut
•
Adjust cable by means of holder (2) until spacing
A = 1 mm is obtained
•
Tighten down nut
Note:
Type 2:
Grip clamping sleeve (1) and slacken nut (2).
Detach retainer (3) towards bottom using a screwdriver.
Pull cable (4) out of holder.
Installation:
Adjust selector lever.
Note:
Version 3:
Release screw (1).
Remove clamp (2).
Release shift cable head (3) using a screwdriver from ball head
of shift cable lever.
Installation:
Adjust selector lever.
Secure lever (1) with a cable tie (2) or wire in vertical position.
Note:
Illustration shows E65.
RA Replacing mechatronics (GA6HP26/6HP32) M57T2
BMW AG - TIS
09.02.2013 18:32
Issue status (12/2007) Valid only until next DVD is issued
Copyright
Page - 2 -