5 Series E61 535xi (N54) TOUR
Release screws (1).
Tightening torque: 11 13 5AZ
.
Installation:
Replace aluminium screws.
Remove oil deflector (2).
Release screws (1).
Tightening torque: 11 11 2AZ
.
Release screws (2).
Tightening torque: 11 11 3AZ
.
Installation:
Replace aluminium screws.
Release screws (1).
Tightening torque: 11 11 4AZ
.
Release screws (2).
Tightening torque: 11 11 2AZ
.
Installation:
Replace aluminium screws.
Release steel screws (1 to 14) from outside inwards.
Tightening torque: 11 11 1AZ
Release screws (1).
Tightening torque 11 11 3AZ
.
Installation:
Replace aluminium screws.
Remove crankshaft lower section in upward direction.
RA Replacing crankshaft (N54)
BMW AG - TIS
19.02.2013 00:14
Issue status (12/2007) Valid only until next DVD is issued
Copyright
Page - 2 -