6 Series 645Ci (N62) Coupe
Markings on suction line and vane pump connection must match
up.
Variant (A) - build date up to 05/2004:
Release screws (1, 2) and remove vane pump towards bottom.
Tightening torque 32 41 1AZ
.
Variant (B) - build date from 05/2004:
Release bolt (1) and nut (2).
Tightening torque 32 41 1AZ
.
Remove vane pump downwards.
After installation:
•
Fill and bleed hydraulic system
•
Check pipe connections for leaks
RA Removing and installing/replacing vane pump for power steering (N62, N62TU)
BMW AG - TIS
18.01.2013 07:52
Issue status (12/2007) Valid only until next DVD is issued
Copyright
Page - 2 -