6 Series E64 645Ci (N62) CONVER
SF
Tensioning spring
U3
Changeover lug (loose)
U4
Changeover lug (fixed)
Course of front straps:
S1 through U1
S2 through U3, U4
SF through U3, U2
Release Torx screw from tension cable mounting (S2) on
convertible top frame.
Release Torx screw from changeover lug (U1).
Installation:
Replace Torx screws and insert with Loctite.
Observe course of front straps.
Release Torx screws of changeover lugs (U2, U3, U4) for tension
cable.
Release Torx screw from tension cable mounting (S1) on
convertible top frame.
Installation:
Replace Torx screws and insert with Loctite.
Observe course of front straps.
Release Torx screw from tensioning spring (SF).
Feed out tension cables.
Installation:
Replace Torx screws and insert with Loctite.
Observe course of front straps.
RA Removing and installing or replacing headlining in convertible top
BMW AG - TIS
04.02.2013 13:29
Issue status (12/2007) Valid only until next DVD is issued
Copyright
Page - 3 -