7 Series E32 740iL (M60-2) SAL
Lift out pot.
Lift out sun gear.
Installation:
Check installed direction.
Lift out planet carriers I and II.
Remove thrust bearing and shaft with hollow gear.
RA Dismantling and assembly / replacing planetary gear sets I and II
BMW AG - TIS
06.02.2013 10:28
Issue status (12/2007) Valid only until next DVD is issued
Copyright
Page - 2 -