7 Series E38 735iL (M62) SAL
Release cylinder-head bolts in sequence 10 ... 1.
Lift off cylinder head.
Installation
Installation of cylinder head is described separately from removal.
Assembly sequence for removal and installation is different.
Clean sealing faces of cylinder head and engine block, if
necessary using wooden scraper to remove gasket debris. Ensure
that no gasket debris drops into the oil and coolant ducts.
Threaded bores in engine block must be free of dirt and oil (risk of
cracking).
Coat joint between engine block and timing case cover with
Drei Bond 1209 (refer to BMW Parts Service).
Check that dowel sleeves are undamaged and correctly located.
Fit new cylinder-head seal.
RA Removing and installing left cylinder head (M62 up to 9/98)
BMW AG - TIS
08.02.2013 21:11
Issue status (12/2007) Valid only until next DVD is issued
Copyright
Page - 5 -