7 Series E38 740d (M67) SAL
Detach charge air hose (1) and tie back to one side.
Installation:
Fit charge air hose dry and without grease.
Caution!
Right turbocharger must be removed together with oil
pressure line.
Oil pressure line must not be damaged or deformed in any
way when removed.
Carefully remove turbocharger (2) in direction of right spring strut,
between front axle support and tie rod, towards bottom.
Installation:
Replace gasket (1).
Caution!
If you fail to adhere strictly to the following sequence for
converting the oil pressure line (1), this may result in oil
pressure loss and damage to the right turbocharger.
To convert oil pressure line:
1.
Determine distance (A) between oil pressure line (1) and
flange of turbocharger.
2.
Release banjo bolt (2).
Tightening torque,
refer to Technical Data 11 65 7AZ .
3.
Replace sealing rings for banjo bolt (2).
4.
Attach oil pressure line (1) to new turbocharger with banjo
bolt (2).
5.
Adjust distance (A).
6.
Tighten down banjo bolt (2).
RA Removing and installing or replacing right exhaust turbocharger (M67)
BMW AG - TIS
10.02.2013 03:02
Issue status (12/2007) Valid only until next DVD is issued
Copyright
Page - 4 -