7 Series E38 750iL (M73) SAL
Align connection point on A-pillar, carrier support and carrier plate
and grind down.
Align connection point on engine support and reinforcement plate
of transmission tunnel inside vehicle and grind down.
Align connection point pipe / rear section of engine support and
grind down.
Clean connection point:
-
Wheel arch / end wall
-
Wheel arch / carrier support
-
Front section of engine support / rear section
-
Pipe / engine support
Note:
To illustrate more clearly, shown with partition wall carrier
plate removed.
RA Replacing front section of engine support to left wheel arch
BMW AG - TIS
20.02.2013 23:50
Issue status (12/2007) Valid only until next DVD is issued
Copyright
Page - 5 -