7 Series E65 735i (N62) SAL
Unscrew nut (1).
Installation:
Replace self-locking nut.
Tightening torque 32 41 5AZ
.
Release banjo bolt and disconnect Dynamic Drive pressure
line (2) with bracket from power steering pump.
Release banjo bolt and disconnect power steering pressure
line (3) from power steering pump.
Installation:
Replace all sealing rings.
Make sure hydraulic lines are laid without tension and with
sufficient spacing to adjoining components.
Tightening torque 32 41 3AZ
.
Release hose clamp and detach suction line (1) from power
steering pump.
Installation:
Align suction line (1) by way of marking to connection on power
steering pump.
Release screw (2).
Tightening torque 32 41 1AZ
.
Variant (A) - build date up to 05/2004:
Release screws (1, 2).
Tightening torque 32 41 1AZ
.
Remove power steering pump (3).
Variant (B) - build date from 05/2004:
Release bolt (1) and nut (2).
Remove power steering pump (3).
Installation:
Replace self-locking nut.
Tightening torque 32 41 1AZ
.
RA Removing and installing power steering pump (N62, N62TU) for power steering gear
BMW AG - TIS
08.02.2013 07:09
Issue status (12/2007) Valid only until next DVD is issued
Copyright
Page - 2 -