bmw Workshop Repair Guides

BMW Workshop Service and Repair Manuals

12 RA Installing Replacement Transmission (GS6-37BZ)|Page 973 > < 11 RA Installing Replacement Transmission (S5D 280Z)|Page 971
Page 1
background image

23 00 036

Installing replacement transmission (GS6-
37BZ)

Important!

After completion of work, check transmission fluid level.

Use only the approved transmission fluid.

Failure to comply with this instruction will result in serious damage
to the transmission.

Recycling:

Catch and dispose of escaping transmission fluid.

Observe country-specific waste-disposal regulations.

Necessary preliminary tasks:

Drain gear oil at oil drain plug. Tightening torque: 

23 00 4AZ

.

Remove transfer box.

Remove transmission.

Convert following parts from previous transmission to new
transmission.

Release bearing and release lever.

Ball pin and spring wire clip.

Studs for clutch slave cylinder.

Reversing light switch tightening torque:  23 41 5AZ

.

RA  Installing replacement transmission (GS6-37BZ)

BMW AG - TIS

06.02.2013  18:20

Issue status (12/2007) Valid only until next DVD is issued

Copyright

Page  - 1 -

12 RA Installing Replacement Transmission (GS6-37BZ)|Page 973 > < 11 RA Installing Replacement Transmission (S5D 280Z)|Page 971