X Series E53 X5 4.4i (M62) OFFRD
Caution!
Left-hand threads.
When releasing camshaft screw connection: grip camshaft at
hexagon head.
Slacken screw connection (1) of exhaust camshaft on cylinder
bank 1 to 4 by approx. a half turn.
Caution!
Left-hand threads.
When releasing camshaft screw connection: grip camshaft at
hexagon head.
Slacken screw connection (2) of inlet camshaft on cylinder
bank 5 to 8 by approx. a half turn.
Caution!
Left-hand threads.
When releasing camshaft screw connection: grip camshaft at
hexagon head.
Slacken screw connection (2) of inlet camshaft on cylinder
bank 1 to 4 by approx. a half turn.
Align camshafts.
Attach special tool 11 2 445 /
11 2 441 to camshafts,
cylinder bank 1 to 4.
RA Adjusting camshaft timing (M62 VANOS from 9/98)
BMW AG - TIS
08.02.2013 02:04
Issue status (12/2007) Valid only until next DVD is issued
Copyright
Page - 5 -