bmw Workshop Repair Guides

BMW Workshop Service and Repair Manuals

4 RA Replacing Timing Chain (M62 VANOS From 9_98)|Page 555 > < 4 RA Replacing Timing Chain (M62 VANOS From 9_98)|Page 553
Page 18
background image

Attach special tool  11 6 440   to camshaft adjustment unit on
cylinder bank 1 to 4 and move at 40 Nm to left-hand stop.

Check left-hand stop of camshaft adjustment unit with acoustic
continuity test on multimeter.

Caution!

Left-hand threads.

When tightening down camshaft screw connection: grip camshaft
at hexagon head.

Tighten down screw connection (2) of inlet camshaft on cylinder
bank 1 to 4.

Tightening torque, 11 36 14AZ

.

Caution!

Left-hand threads.

When tightening down camshaft screw connection: grip camshaft
at hexagon head.

Tighten down screw connection (1) of exhaust camshaft on
cylinder bank 1 to 4.

Tightening torque, 11 36 13AZ

.

Attach sensor gear (2) to cylinder bank 1 to 4.

RA  Replacing timing chain (M62 VANOS from 9/98)

BMW AG - TIS

08.02.2013  02:06

Issue status (12/2007) Valid only until next DVD is issued

Copyright

Page  - 18 -

4 RA Replacing Timing Chain (M62 VANOS From 9_98)|Page 555 > < 4 RA Replacing Timing Chain (M62 VANOS From 9_98)|Page 553