X Series E53 X5 4.4i (M62) OFFRD
Installation:
Line holder must be replaced.
Make sure lines are correctly laid.
Release nut (1) and remove screw.
Take off control arm.
Installation:
Note insertion direction of bolt.
Replace self-locking nut.
Tighten bolt connection in normal position.
Tightening torque 33 32 14AZ
.
After installation:
•
Activate and fill air suspension system
•
Perform chassis alignment check
RA Replacing one upper control arm
BMW AG - TIS
08.02.2013 06:27
Issue status (12/2007) Valid only until next DVD is issued
Copyright
Page - 2 -