X Series E53 X5 4.4i (M62) OFFRD
Open welding spots (1).
Mark and cut severance cuts as shown in illustration.
Measurement a = 100 mm or 50 mm from screw holes.
Measurement b = 460 mm from upper screw point of upper B-pillar hinge.
Measurement c = 50 mm
Measurement d = 400 mm from lower screw point of lock striker in C-pillar.
RA Replacing left or right side member cover (partial replacement of A-pillar and r
BMW AG - TIS
08.02.2013 08:24
Issue status (12/2007) Valid only until next DVD is issued
Copyright
Page - 2 -