X Series E53 X5 4.8is (N62-S) OFFRD
Release screws along line (1).
Carefully remove upper section of oil sump (2) towards rear.
Tightening torque: 11 13 2AZ
.
Installation:
Sealing faces clean and free of seal debris.
Coat engine block at gap to end cover and to timing case
cover with Drei Bond 1209 sealing compound (refer
to BMW Parts Service).
Installation:
1.
Replace gasket
2.
Install oil sump.
3.
Insert all oil sump screws.
4.
Insert screws in transmission end without preload at this
stage.
5.
Tighten down screws in engine end.
6.
Tighten down screws in transmission end.
RA Removing and installing/replacing upper section of oil sump (M62)
BMW AG - TIS
12.02.2013 03:52
Issue status (12/2007) Valid only until next DVD is issued
Copyright
Page - 3 -