bmw Workshop Repair Guides

BMW Workshop Service and Repair Manuals

72 Air Pump, Lines And Control Valves > < 1 RA Removing And Installing Or Replacing EGR Cooler (N47)
Page 2
background image

Release screws (1).

Installation:

Replace seal.

Release screws (1).

Release screw (1).

Installation:

Replace all seals.

Assemble engine.

Vent cooling system.

Check cooling system for leaks.

RA  Removing and installing or replacing EGR cooler (N47)

BMW AG - TIS

12.02.2013  04:43

Issue status (12/2007) Valid only until next DVD is issued

Copyright

Page  - 2 -

72 Air Pump, Lines And Control Valves > < 1 RA Removing And Installing Or Replacing EGR Cooler (N47)