X Series E53 X5 4.8is (N62-S) OFFRD
If necessary, remove heat shield from power steering gear.
Release banjo bolts.
Version with Servotronic: Disconnect plug connection on
Servotronic converter.
Disconnect hydraulic lines from power steering gear.
If necessary, remove hydraulic lines with bracket from power
steering gear/front axle carrier.
Remove power steering gear to left side.
Installation:
Replace sealing rings (D).
Make sure hydraulic lines are laid without tension and with
sufficient spacing to adjoining components.
Tightening torque 32 41 3AZ
.
RA Removing and installing power steering gear
BMW AG - TIS
12.02.2013 07:04
Issue status (12/2007) Valid only until next DVD is issued
Copyright
Page - 2 -