X Series E70 X5 4.8i (N62TU) OFFRD
Release banjo bolt (1) and remove pressure line (2) from power
steering gear.
Installation:
Replace all sealing rings.
Make sure hydraulic line is laid without tension and with sufficient
spacing to adjoining components.
Tightening torque 32 41 5AZ
.
Expose pressure line up to cutting line on front axle carrier.
Release nut (1) and remove pressure line (2).
Installation:
Make sure hydraulic line is laid without tension and with sufficient
spacing to adjoining components.
Tightening torque 32 41 11AZ
.
After installation:
•
Fill and bleed hydraulic system
•
Check pipe connections for leaks
•
Perform chassis alignment check
•
Carry out steering angle sensor adjustment/adjustment for
active front steering
RA Replacing pressure line for power steering (from cutting line to steering gear)
BMW AG - TIS
08.02.2013 03:55
Issue status (12/2007) Valid only until next DVD is issued
Copyright
Page - 2 -