X Series E83 X3 2.0d (N47) OFFRD
Release union nut (1) on high-pressure pump.
Remove high-pressure line
Installation:
Install pressure line and tighten hand-tight at both ends. Screw
down pressure line first on rail side and then on pump side.
Tightening torque, 13 53 2AZ
Assemble engine.
Check fuel system for leaks.
RA Replacing pressure line (between high-pressure pump and pressure accumulator) (N
BMW AG - TIS
05.02.2013 22:27
Issue status (12/2007) Valid only until next DVD is issued
Copyright
Page - 3 -