X Series E83 X3 2.0d (N47) OFFRD
25 11 000
Removing and installing shift lever
Special tools required:
•
25 1 120
Necessary preliminary tasks:
-
Remove complete exhaust system.
-
Remove heat shield.
-
Remove transmission cross-member.
Release screws.
Tightening torque 26 11 6AZ
.
Note:
Lower transmission.
Important!
Risk of damage:
Engine must not rest against bulkhead.
RA Removing and installing shift lever
BMW AG - TIS
05.02.2013 23:37
Issue status (12/2007) Valid only until next DVD is issued
Copyright
Page - 1 -