Z Series E85 M roadst (S54) ROADST
Install retaining ring (1).
Installation:
twist retaining ring until both ends settle into the groove.
Clean running surface for shaft seal on drive flange thoroughly
and moisten with approved rear differential oil.
Replacement:
Replace shaft seal.
After installation:
•
Correct gearbox oil level/change differential oil
RA Replacing left or right drive flange on rear differential (M Roadster, M Coupé)
BMW AG - TIS
06.02.2013 23:54
Issue status (12/2007) Valid only until next DVD is issued
Copyright
Page - 2 -