bmw Workshop Repair Guides

BMW Workshop Service and Repair Manuals

2 RA Replacing Intake Hose (between Air-mass Flow Sensor And Connecting Piece) (M54) > < 2 RA Replacing, Sealing Fuel Hoses|Page 579
Page 1
background image

13 54 030

Removing and installing/sealing throttle
assembly (M54)

Necessary preliminary tasks:

Switch off ignition

Disconnect battery negative lead from battery and lay to one

side

Follow instructions for disconnecting and connecting battery.

If fitted (E85): remove sound generator

Remove air intake hose

Release screws (1) of cable duct mounting.

Place cable channel to one side.

Unlock plug (1) and detach from throttle assembly (3).

Release screws (2) and remove throttle assembly (3).

Installation:

Replace sealing ring (1) on throttle assembly (2).

RA  Removing and installing/sealing throttle assembly (M54)

BMW AG - TIS

10.02.2013  19:31

Issue status (12/2007) Valid only until next DVD is issued

Copyright

Page  - 1 -

2 RA Replacing Intake Hose (between Air-mass Flow Sensor And Connecting Piece) (M54) > < 2 RA Replacing, Sealing Fuel Hoses|Page 579