bmw Workshop Repair Guides

BMW Workshop Service and Repair Manuals

9 RA Removing And Installing Automatic Transmission (6HP19Z_N52)|Page 762 > < 9 RA Removing And Installing Automatic Transmission (6HP19Z_N52)|Page 760
Page 5
background image

Crank engine at vibration damper in direction of rotation until
screw (1) is visible in opening.

Release all screws of torque converter with special tool 
24 1 110 .

Crank engine further and release remaining 5 bolts.

Tightening torque 24 40 1AZ

.

Unfasten screws.

Installation:

Observe screw fastening sequence without fail.

Tightening torque, steel screws 24 00 1AZ

.

Aluminium screws must be replaced.

Tightening torque and angle of rotation 

Aluminium screws 24 00 2AZ

.

Installation:

Secure angle of rotation special tool 00 9 120  with magnet 
00 9 130  to floor plate.

Screw down aluminium screws according to angle of rotation.

Angle of rotation 24 00 2AZ

.

Installation:

Bore (1) in driving disk must be accessible from opening on
engine oil pan.

RA  Removing and installing automatic transmission (6HP19Z/N52)

BMW AG - TIS

12.02.2013  05:09

Issue status (12/2007) Valid only until next DVD is issued

Copyright

Page  - 5 -

9 RA Removing And Installing Automatic Transmission (6HP19Z_N52)|Page 762 > < 9 RA Removing And Installing Automatic Transmission (6HP19Z_N52)|Page 760