Z Series E85 Z4 2.5i (N52) ROADST
Insert special tool 25 1 110 into mount and turn 90
°
counterclockwise.
Press mount upwards out of selector arm.
Feed U-gaiter from shift arm and out of body cutout.
Installation:
Pull U-gaiter bead (4) over receptacle on shift arm and pop U-
gaiter lips (3) into body cutout.
Make sure the arrow on the upper U-gaiter lip (3) is seated in the
direction of travel and crossways to the shift lever eye (5).
Key:
1.
Shift lever
2.
U-gaiter moulded section
3.
U-gaiter lips
4.
U-gaiter bead
5.
Shift lever eye
Installation:
Grease selector lever ball.
Fit mount on shift arm receptacle.
Align retaining lugs of mount to openings in receptacle
(crossways to direction of travel).
Press shift arm with mount downwards until mount snaps
audibly into place (if necessary, use a tool for pressing in).
RA Removing and installing shift lever
BMW AG - TIS
12.02.2013 05:25
Issue status (12/2007) Valid only until next DVD is issued
Copyright
Page - 2 -