Z Series E85 Z4 2.5Si (N52) ROADST
Installation:
Check threaded pin for damage, replace if necessary.
Tightening torque 33 33 2AZ
.
After installation:
•
Perform chassis alignment check
RA Lowering/raising rear axle carrier
BMW AG - TIS
13.02.2013 12:44
Issue status (12/2007) Valid only until next DVD is issued
Copyright
Page - 3 -