buick Workshop Repair Guides

Buick Workshop Service and Repair Manuals

Deployment Procedures|Page 7743 > < Deployment Procedures|Page 7741
Page 2
background image

-

To mount, use 4 M 6 bolts (6), nuts (8), and washers (7) in order to properly secure the IP module (1) to the deployment fixture.

-

Securely tighten all fasteners prior to deployment.

10. When deploying the side impact module - LF, refer to the following instructions:

-

Place the J 39401-B SIR deployment fixture (3) in the center of the cleared area.

-

Fill the deployment fixture with water or sand.

-

Mount the side impact module (1) in the deployment fixture (3) with the vinyl/plastic trim cover facing up.

-

Adjust and secure the J 39401-B arms (4) to the deployment fixture (3).

-

To mount, use 2 M 6 x 1.0 nuts (2) with washers in order to secure the side impact module (1) to the deployment fixture arms (4).

-

Securely tighten all fasteners prior to deployment.

11. Inspect the J 38826 and the appropriate pigtail adapter for damage. Replace as needed.
12. Short the 2 SIR deployment harness (1) leads together using one banana plug seated into the other.
13. Connect the appropriate pigtail adapter (2) to the SIR deployment harness (1).

14. Extend the SIR deployment harness and adapter to full length from the deployment fixture.

15. Connect the inflator module (1) to the adapter (2) on the SIR deployment harness (3).
16. Clear the area of people.

IMPORTANT:
-

The rapid expansion of gas involved with deploying an inflator module is very loud. Notify all the people in the immediate area that you intend to
deploy the inflator module.

-

When the inflator module deploys, the deployment fixture may jump about 30 cm (1 ft) vertically. This is a normal reaction of the inflator module
due to the force of the rapid expansion of gas inside the inflator module.

Deployment Procedures|Page 7743 > < Deployment Procedures|Page 7741