buick Workshop Repair Guides

Buick Workshop Service and Repair Manuals

Connecting Rod Bearing Replacement|Page 3943 > < Connecting Rod Bearing Replacement
Page 2
background image

^

Tools Required 
-

J 5239 Connecting Rod Bolt Guide Set

-

J 36660 Torque Angle Meter

1. Install upper connecting rod bearing into connecting rod.
2. Coat the inside surfaces of the upper connecting rod bearing with new engine oil.
3. Using the J 5239
4. Remove the J 5239
5. Install the lower connecting rod bearing into the connecting rod cap.
6. Coat the inside surfaces of the lower connecting rod bearing with new engine oil.
7. Install the connecting rod cap with lower connecting rod bearing.

8. Install the connecting rod nuts.

^

Tighten the connecting rod nuts to 20 Nm (15 ft. lbs.). Evenly turn the nuts an additional 75 degrees using the J 36660

Notice:  Refer to Fastener Notice in Service Precautions.

9. Measure the connecting rod clearance using the following procedure:

9.1. Install all the connecting rod bearings.
9.2. Lightly tap each connecting rod parallel to the crankpin in order to make sure the connecting rods have clearance.
9.3. Measure the side clearance between the connecting rod caps using a feeler gage, or dial indicator.

10. Install the crankshaft oil deflector.
11. Install the oil pump.
12. Install the oil pan.

Connecting Rod Bearing Replacement|Page 3943 > < Connecting Rod Bearing Replacement